The design and building of the new roof has been the greatest challenge. Here are some views of the roof construction.
And here are some pictures that just don't fit into any convenient category...
Chuck's mobile dumpster (a very old dump truck!) and the Concrete truck. It took 3 of those trucks to pour the foundation and pool room floor! | |
DSC00188.JPG 870.51 KB |
DSC00665.JPG 873.33 KB |
Looking straight down where the new support post will go. Notice the rebar that's been drilled into one of the existing concrete pillars. |
|
DSC00662.JPG 852.45 KB |
DSC00664.JPG 889.59 KB |
Our new pool room floor. It's a concrete stamp on colored concrete. |
|
DSC00740.JPG 814.06 KB |
DSC00741.JPG 870.52 KB |
Some examples of the size of the posts, beams and rafters used. |
|
DSC00755.JPG 802.80 KB |
DSC00758.JPG 852.89 KB |
DSC00774.JPG 816.33 KB |
|
DSC00806.JPG 259.04 KB |
DSC00808.JPG 867.91 KB |
The earthquake tie downs are also pretty massive. The blue and black cable is for my computer and cable TV. |
|
DSC00803.JPG 195.78 KB |
|
Windows, windows, and more windows (some not in yet). |
|
DSC00797.JPG 871.41 KB |
DSC00810.JPG 791.90 KB |
DSC00800.JPG 851.85 KB |
DSC00809.JPG 901.78 KB |
DSC00798.JPG 865.11 KB |
DSC00801.JPG 230.65 KB |
DSC00804.JPG 783.42 KB |
|